Steel structure of the main plant of CLP Hubu coal-fired power plant in Pakistan

Project category: "Belt and Road" project; the first large-scale coal-fired power station project invested in Pakistan
One of the 51 China-Pakistan cooperation agreements signed by President Xi Jinping during his visit to Pakistan in April 2015

Baowo Cement Plant in Pakistan

Steel structure: Guohua Zheneng Ninghai Power Plant phase I, phase II coal transport system, lantern frame, trestle, etc
Building height: 50 meters, and the trestle length is more than 100 meters
Total steel volume: 4,800 tons.

Ninghai power plant

Steel structure: Guohua Zheneng Ninghai Power Plant phase I, phase II coal transport system, lantern frame, trestle, etc
Building height: 50 meters, and the trestle length is more than 100 meters
Total steel volume: 4,800 tons.

Zhejiang Zheneng Lanxi power plant 3 #, 4 # unit centralized control building

Main powerhouse (building elevation: 43.66 m)
Coal bunker room (building elevation of 57 m)
Total steel volume: 6,800 tons