Huaxing steel structure- -making steel components for The coal-fired power generation project in Pakistan
Huaxing Steel Structure expanded the international market, and cooperated with Tianjin Power Construction to win the bid of Pakistan China Power Hub Power Plant steel structure project. Thanks to the rapid development of "Belt and Road" construction, Huaxing steel structure has a "new navigation beacon". In 2017, Huaxing Steel Structure undertook the steel structure production of- -CLP Hub supercritical coal-fired power station project in Pakistan.
With a total investment of nearly $2 billion, the project is expected to achieve commercial operation in 2019. It is one of the 51 China-Pakistan cooperation agreements signed by President Xi Jinping during his visit to Pakistan in April 2015. It is also the first large-scale coal-fired power station project invested by CLP International in Pakistan. It has won strong support from the China and Pakistan governments and has been included in the energy demonstration project of the China-Pakistan Economic Corridor.
Huaxing Steel Structure is responsible for the design, deepening design and processing of the steel structure construction drawing of the project. The total steel volume of the project is 10,000 tons, the maximum height of the main workshop is 55 meters, the maximum height of the steel column section is 1.4 meters, and the maximum plate thickness is 50mm. The steel plate adopts Q345B ignition and flaw detection plate, and meets the performance requirements of Z15. With years of rich experience in domestic power plant construction, Huaxing will build this project into a first-class quality project.
When completed, the project will strongly promote the economic development of Pakistan, drive the local economic development, and improve the employment rate and the living standards of the residents. The project components are made by the headquarters of Huaxing Steel Structure Co., LTD., and are mainly used for the steel structure installation of the main workshop of the two units (including steam engine room, deaerating room, coal bunker room and furnace front platform). The smooth undertaking of the project brings new opportunities to Huaxing steel structure.
In 2017, Huaxing Steel Structure will continue to expand and improve the business layout. —— Accelerate the pace of "going out", extend the industrial chain, expand the export of steel structure products, and enhance the overall competitiveness of the company's overseas business; at the same time, embrace the "PPP" project, support "BIM" and other emerging technologies, and make unremitting efforts towards the enterprise goal of "building the first star brand of China Steel Structure".
TOP NEWS
- 2023-07-19 Zhejiang Fashion Institute of Technology Sports hall project
- 2023-07-07 The first phase of the middle management personnel of Huaxing Steel Structure was a complete success
- 2023-04-17 Happy news! Huaxing Steel Structure Co.,Ltd won the bid for the construction project of Andong Central School in Qianwan New District
- 2022-05-31 The general contract of Ningbo Huajie project has achieved phased results
- 2022-05-12 The 2022 annual marketing conference of 2022 was successfully held
- 2022-05-12 Zhejiang Province Second Construction Group visit